Excel to Flowchart

Turn spreadsheet rows into a flowchart with branches and swimlanes. Uses the same columns as Visio's Data Visualizer, without needing Visio. Download PNG or SVG for free, or an editable Visio file for 1 credit.

Your process

Copy the cells in Excel and paste them here, or drop a file on the box. Edit the rows here to fix anything.

Flowchart (6 steps)
Mermaid code
flowchart TD
    subgraph L1["Sales"]
        S1(["Order received"])
        S6(["Order complete"])
    end
    subgraph L2["Warehouse"]
        S2{"Item in stock?"}
        S3["Pick and pack"]
        S5["Ship to customer"]
    end
    subgraph L3["Purchasing"]
        S4["Order from supplier"]
    end
    S1 --> S2
    S2 -->|"Yes"| S3
    S2 -->|"No"| S4
    S3 --> S5
    S4 --> S3
    S5 --> S6

Frequently asked questions

How do I turn an Excel sheet into a flowchart?

Put one process step per row with a Process Step ID, a description, and the ID of the next step. Upload the .xlsx or CSV, or copy the cells in Excel and paste them into the box. The flowchart draws itself; download it as PNG or SVG, or as an editable Visio file.

What columns does the spreadsheet need?

Only Process Step ID is required. The others are Process Step Description (the text in the shape), Next Step ID (several IDs separated by commas for a branch), Connector Label (one label per next step, also comma-separated), Shape Type (Process, Decision, Start, End, Subprocess, Data, Database) and Function (each value becomes a swimlane). Download the template to start from a working example.

Does it work with Visio Data Visualizer spreadsheets?

Yes. The column names are the ones in Visio's Data Visualizer process template, so a sheet made for Visio works here unchanged, and you don't need Visio Plan 2 or the Excel add-in. The Phase column is not drawn.

Can I get the flowchart as a Visio file?

Yes. Click Visio (.vsdx) to open the flowchart in our Mermaid to Visio exporter, which builds a native Visio file with real shapes and glued connectors. It uses 1 credit; credits are 30 for $5 with no subscription. PNG and SVG downloads are free.

Why does it say a next step doesn't match?

Every value in Next Step ID has to be the Process Step ID of another row, spelled the same way. The message gives the row number so you can fix it in the box or in your sheet.

Is my spreadsheet uploaded?

No. The file is read in your browser and nothing is sent to our servers. Only the first sheet is used, and old .xls files need saving as .xlsx or CSV first.

Other converters