Copy the cells in Excel and paste them here, or drop a file on the box. Edit the rows here to fix anything.
gantt
dateFormat YYYY-MM-DD
axisFormat %b %d
section Planning
Kick-off meeting :done, 2026-01-05, 2026-01-06
Requirements :done, 2026-01-06, 2026-01-17
section Build
Design :active, 2026-01-17, 2026-01-27
Development :2026-01-27, 2026-02-11
section Launch
Testing :crit, 2026-02-11, 2026-02-19
Go live :milestone, 2026-02-19, 0dFrequently asked questions
How do I turn an Excel sheet into a Gantt chart?
Put one task per row with a Task name, a Start date and an End date (or a Duration in days). Upload the .xlsx or CSV, or copy the cells in Excel and paste them into the box. The chart draws itself; download it as PNG or SVG.
What columns does the spreadsheet need?
Task and Start, plus End or Duration. Optional: Section (or Phase) groups tasks into rows of the chart, Depends On (or Predecessors) lets a task start the day after another ends, Status can be Done, Active, Critical or Milestone, and ID names a task for Depends On. Without an ID column, tasks are numbered 1, 2, 3 from the top, as in Microsoft Project. Download the template to start from a working example.
Which date formats work?
Real Excel date cells, 2026-01-05, 1/5/2026, 05.01.2026, 5-Jan-26, Jan 5 2026 and Microsoft Project's Mon 1/5/26. Dates like 3/4/2026 are read as month/day unless some date in the sheet has a day above 12, which marks the sheet as day/month. The End date is the last day of the task, so a task from Jan 5 to Jan 5 is one day long.
Can I paste a task list from Microsoft Project?
Yes. Copy the Task Name, Duration, Start, Finish and Predecessors columns with their headers. Predecessor link types and lags (like 3FS+2 days) aren't drawn: a dependent task without its own start date begins the day after its predecessor ends.
Is my spreadsheet uploaded?
No. The file is read in your browser and nothing is sent to our servers. Only the first sheet is used, and old .xls files need saving as .xlsx or CSV first.
Is it free?
Yes. There's no sign-up and no watermark. The chart is Mermaid code, so you can also copy it into GitHub, Notion, Obsidian or any other Markdown editor that renders Mermaid and keep editing it there.
How to make a Gantt chart in Excel itself
Excel has no Gantt chart type, but a stacked bar chart can be made to look like one. If the chart has to live inside the workbook:
- Make a table with Task, Start date and Duration (in days). If you have end dates, add a column with
=End-Start+1. - Select the Task and Start columns, then Insert > Bar chart > Stacked Bar.
- Right-click the chart, Select Data, and add Duration as a second series. Its bars are your tasks.
- Click the Start series and set its fill to No Fill, so only the duration bars show.
- Right-click the task axis, Format Axis, and tick "Categories in reverse order" so the first task is at the top.
- Right-click the date axis and set its minimum to your first start date. Excel shows dates as numbers here (for example 46027 is 2026-01-05): type the date into a cell, format it as a number, and use that.
This chart doesn't move tasks when a dependency slips, and every new task means extending the chart's data range. The tool above redraws from the rows each time you paste.
Other converters
- Excel to flowchart: process steps in a sheet as a flowchart with swimlanes
- Chart to Excel: the numbers behind a chart image, as a spreadsheet
- Mermaid to PNG: any Mermaid chart as PNG or SVG
- ER diagram to SQL: CREATE TABLE statements from a Mermaid ER diagram, free
- Image to Mermaid: a screenshot or photo of a diagram, read by AI